|
| |


Founded
in 1960, Teradyne is the world's largest supplier of automatic test equipment
and high-performance interconnection systems for the electronics,
telecommunications, and Internet industries.
Our global network includes 50 regional centers, offering Teradyne customers
throughout the world a convenient local resource for sales, service and
applications engineering support.
|
Xstation HS
In-line High Speed Automated X-Ray
Inspection (AXI) System
World's Fastest AXI Solution
The XStation HS inspection system is
capable of providing uncompromising defect coverage at the speed of your
line. Teradyne's transmission X-ray technique provides users with full
volumetric analysis of solder joints at triple the speed of Laminographic
X-ray inspection. Electronics manufacturers now have an X-ray
inspection solution with the speed and fault resolution required to inspect
the latest package technologies, including: BGA's, CSP's, and FCA's.
-
Fastest throughput of any AXI
system
-
Triple the speed of X-ray
Laminography
-
Best image quality of any AXI
system
-
Lead-free solder inspection
capable
|

- Provides full volumetric analysis of
solder joints
- Fixtureless inspection for faster, lower
cost test
- Improves product reliability by
identifying structural faults not tested by other inspection methodologies
- Provides measurement data for trend
analysis and process control
- Excellent diagnostic resolution for rapid
debug and repair
|
|

|
Test Station LH
Quality In-Circuit Test at an Affordable Price
The TestStation LH in-circuit tes system is a lower cost, small
footprint, feature scalable, version of Teradyne's popular, award winning
TestStaion 12X product family. The TestStation LH system features the
voltage accuracy and backdrive current measurement embedded in Teradyne's
SafeTest protection technology for accurate, reliable, and safe powered-up
testing of new low-voltage technologies. |
|
Test Station SE
Price break through for full capability in-circuit
test system
The TestStation SE is a result of over 25 years of experience and
leadership in the area of in-circuit test (ICT). It features the
technology, proven reliability, and convenience that you have come to expect
from Teradyne, and represents the best in-circuit test value at the best
price for high-volume electronics manufacturers needing flexibility and
adaptability in manufacturing process test. Everything is included
with the TestStation SE: computer, software, vector-less testing, and
Teradyne's award winning, worldwide network of support and service.
All at a price that rivals some MDA's.
|

- No-Compromise In-Circuit Test
- Rapid Program Development
- Comprehensive Test Tool Set
- Low Cost of Ownership
- Small Footprint
|
|
Spectrum 8800 - Series
Today's high-volume
electronics products require a new level of manufacturing and test
capability. Ever-shrinking product cycles and unpredictable changes in
demand and shipping levels mean you need rapid line set up and changeover,
highline rates, and minimum Work In Process (WIP). Your customers' demand
for lower-cost products translates into a continuous "cost-down" strategy in
manufacturing and test.
And when it comes to
communications and computer products like network switches, cell phones.
PDAs, and laptops, you need a manufacturing and test capability than can
handle mixed-signal and RF, low-power technologies, and increasingly dense
packaging.
Whatever your technical
challenge, the Spectrum 8800-Series VXI Manufacturing Test Platform can help
you meet it. Designed for high-volume manufacturing environments at OEMS
and contract manufacturers, the Spectrum 8800-Series delivers the
following:>
|

-
Highest process fault
coverage, including full vectorless test.
-
High-performance analog
and mixed-signal test.
-
Prototype in-circuit test
program in four hours or less.
-
Production test program
in three days.
-
Fixture build in three
days.
-
Meet a line rate of 10-15
seconds.
-
Automation ready for
in-line deployment.
-
Low capital and running
costs.
-
Full data-collection
facilities.
-
Platform for reducing
test steps and improving final-test stage yields.
|
| |
|